3.6 - PASSABLE RAMP
CEMENT FLOORING AND SUPPORT WITH ANTIDRIP FINISHING
- Slanting cement support treated with Primer V70
- Water tank
- Iter Route base membrane
- Iter Route finishing membrane
- Separation layer
- Reinforced concrete flooring
- Support frame grate for covering the basin
- Basin covering passable