3.6 - PASSABLE RAMP CEMENT FLOORING AND SUPPORT WITH ANTIDRIP FINISHING
  1. Slanting cement support treated with Primer V70
  2. Water tank
  3. Iter Route base membrane
  4. Iter Route finishing membrane
  5. Separation layer
  6. Reinforced concrete flooring
  7. Support frame grate for covering the basin
  8. Basin covering passable
3.6 - PASSABLE RAMP
CEMENT FLOORING AND SUPPORT WITH ANTIDRIP FINISHING,